Stay Up-To-Date

Subscribe to our mailing list to receive news releases and other materials related to Your email will never be shared or sold and you can opt out at any time.

CSE: TCEC
OTCQB: TCEFF
FSE: C9O
CONNECT WITH US

Developing TheFraser Lakes B Uranium Deposit

The rising need for clean energy is quickly translating into a higher global demand for uranium - Terra Clean Energy is focused on acquiring and exploring uranium projects to help meet this demand.

SCROLL TO CONTINUE READING

SOUTH FALCON EAST

The South Falcon East property covers approx. 12,234 ha and lies 18 kilometers outside the southeast portion of the Athabasca Basin, 55 kilometers east of the Key Lake Mine. The project area is in close proximity to two all-weather northern highways and grid power.

PROJECT HIGHLIGHTS

TCEC Icon

Geological and geochemical features show distinct similarities to high grade, basement-hosted deposits in the Athabasca Basin such as Eagle Point, Millennium, P-Patch and Roughrider

TCEC Icon

Exploration potential of the 6 by 7-kilometre Fraser Lakes target area is considered exceptional, including resource expansion potential along strike and at depth at the Zone B uranium deposit

TCEC Icon

In March of 2015, Skyharbour updated the historical NI 43-101 mineral resource estimate* for the Fraser Lakes Zone B deposit at the south end of the property:

  • 6,960,681 pounds U3O8 inferred at average grade of 0.03% U3O8 and 5,339,219 pounds ThO2 inferred at average grade of 0.023% ThO2 within 10,354,926 tonnes (cutoff grade of 0.01% U3O8)

TCEC Icon

Winter/spring 2015 drill program consisted of 1,278 metres in five holes:

  • Intersected highest grade mineralization found to date in deposit area: 0.172% U3O8 and 0.112% ThO2 over 2.5 metres
  • Breakthrough towards finding more and higher-grade uranium mineralization at shallow depths

*The historical resource is described in a technical report on the Falcon Point uranium project, Northern Saskatchewan, dated March 20, 2015, and filed on SEDAR by Skyharbour Resources Ltd. Tisdale is not treating the resource as current and has not completed sufficient work to classify the resource as a current mineral resource. While Tisdale is not treating the historical resource as current, it does believe the work conducted is reliable and the information may be of assistance to readers.

Phase 1 Drilling

Terra’s initial phase one program included 442m drilled in two drill holes during February of 2024. Hole SF-0059 was completed to a depth of 221m and intersected multiple zones of uranium mineralization over 13.5m, confirming the presence of mineralization in the vicinity of historical hole FP-15-05. Highlights include:

  • 0.02% eU3O8 over 5.6m from 129.65 to 135.25 m, including:
    • 0.07% eU3O8 over 1.1m from 131.75 to 132.85m. This included a 0.2m interval grading 0.11% eU3O8
  • 0.03% eU3O8 over 4.1m from 137.65 to 141.75 m, including:
    • 0.11% eU3O8 over 0.2m from 138.15 to 138.35m
    • 0.05% eU3O8 over 0.2m from 139.55 to 139.75m
    • 0.06% eU3O8 over 0.2m from 141.35. to 141.55m
Continue Reading
© Terra Clean Energy Corp. 2024 All Rights Reserved. Legal